Post-hole concrete calculator

Estimate concrete for round holes with round or square posts, subtract post displacement, and calculate whole bags for the full job.

Updated · Calculation and editorial methods

Your project

Choose units separately for each measurement. Changing a unit converts the value; Metric and Imperial switch the whole project. For 10 ft 6 in, enter 10.5 ft or 126 in.

Starting values are examples, not specifications. Replace them with your measurements and product details.

Choose a standard concrete bag yield
Optional bag-yield presets

QUIKRETE Concrete Mix No. 1101. Check your actual product label. Selecting a preset clears the old bag price.

in
Measure this dimension in the selected unit. Changing its unit converts the existing measurement.
ft
Enter the specified concrete thickness or fill depth. This tool does not choose a structural dimension.
Choose the actual cross-section of the post.
in
Round: actual diameter. Square: actual side width, not its nominal lumber name.
Whole pieces or identical holes. The project combines their quantity before final ordering.
ft³
Mixed yield per bag from the exact product label, not dry bag weight.
%
Extra material for cuts, spillage or irregular edges. Adjust for your project.
Optional. Enter your supplier’s price; 0 leaves cost out.

Currency labels do not convert prices. Area and volume prices use the basis shown beside their field.

YOUR ESTIMATE

Enter your measurements and select Calculate estimate.

Planning estimate only. Confirm the product’s coverage and your measurements before ordering.

Visual breakdown & compare changes ↓

Plan supporting materials

Calculate a separate drainage layer and count-based supplies for the entered holes.

How to use this estimate

Choose round or square and measure the actual post size. Enter concrete fill depth only: omit a gravel layer below the concrete. The post is assumed to occupy the entire fill depth. Enter the number of identical holes; the tool adds all volumes and rounds bags once for the full job, so partial bags can be shared between holes. It also checks that a square post’s diagonal fits inside the circular hole.

DiameterDepth
Diameter spans the full hole. Fill depth is the concrete depth, and post displacement is subtracted. Schematic, not to scale.

Before you order

  • Measure the hole diameter across its centre. Enter the actual post width, not the nominal timber size.
  • Buy the whole-job rounded bag count. Confirm the product is suitable for the installation method; dry placement and premixing are not interchangeable instructions.

The calculation

Hole area = π × diameter² ÷ 4. Post area = π × diameter² ÷ 4 for round posts, or side² for square posts. Concrete = (hole area − post area) × fill depth × number of holes.

A worked example

Six holes, each 12 in across and filled 2 ft deep around 4 in round posts, need 8.3776 ft³ before allowance. At 10% extra and 0.6 ft³ per bag, buy 16 bags.

Main calculator scope: Cylindrical holes and round or square posts only. No taper, bell base or enlarged excavation is modeled. Hole dimensions are inputs, not recommendations for embedment, wind loads, frost depth or structural safety. Use the optional supporting-materials section for separately quantified supplies.

Round versus square posts: the difference is real

A circular post with a 4 in diameter occupies about 12.57 in² of cross-section. A square post with an actual 4 in side occupies 16 in². Inside the same hole, the square post displaces more concrete. Nominal timber sizes are not measurements; use the actual finished side.

For six circular holes 12 in across, with 24 in of concrete fill around square posts measuring 3.5 in per side, the net concrete is approximately 8.4039 ft³. At 10% extra and 0.6 ft³ per bag, the total is 15.4072 bag yields, so the order rounds to 16 bags.

Why a positive area is not enough

A square must physically fit in a circular hole. Its diagonal is side × √2. A 4 in square has a diagonal of approximately 5.657 in, so it does not fit in a 5 in hole even though subtracting its area from the circle’s area would leave a positive number. The calculator rejects this case instead of producing a misleading volume.

Rounding for the entire fence

The fractional bags-per-hole result helps explain material use, but it is not a separate shopping list. In the example, about 2.568 bag yields are needed per hole with allowance. Rounding each hole to three bags would give 18 bags, whereas pooling all six holes gives 16. Whether mix can be shared between holes depends on the product’s working time and your installation sequence; follow the manufacturer’s instructions.

  • Enter only concrete depth. If the bottom of the excavation contains a separate gravel layer, omit that layer from concrete fill depth.
  • Group identical holes. Calculate different diameters or depths separately, then combine volume before rounding if the material can be shared.
  • Use another takeoff for tapered or flared holes. A cylindrical approximation can miss a wider base.
  • Verify design depth, diameter and installation method independently; these are not determined by bag count.

For a concrete-only pier without a post, or a rectangular post with unequal sides, this particular shape model does not apply. Do not enter a guessed substitute width. Use the approved net volume in the bag tool instead.

Post-setting supplies

Calculate a separate drainage layer and count-based supplies for the entered holes.

  • Specified gravel beneath holes: The starting area is the sum of full circular hole footprints, before post displacement. A layer entirely below the post is assumed; revise the area if the post occupies this layer. Depth is additional to concrete fill, not a deduction from it.
  • Specified fittings / fixings: Enter units per post and box size from the actual fitting plan; one entered hole is treated as one post.
  • Temporary bracing supplies: Enter actual units to buy; reusable braces can be shared across installation stages and should not be automatically multiplied by hole count.

Confirm hole geometry, drainage method, post type, embedment and braces. This list does not select structural connections or reproduce a post-design rule.

Open Include installation supplies above to enter each selected product’s coverage or takeoff and round purchases to whole packages. Accessories use installed measurements, with a separate allowance for each line. Copy, print or download the calculated list as CSV; missing details and unpriced supplies remain explicit. Custom areas and run lists apply once to the entire selected scope.

Installation references, checked 2 November 2026: QUIKRETE post-setting materials. Use the current instructions for the exact product; these references do not prescribe a complete assembly.

Common questions

Can I enter a nominal 4 × 4 timber post?

Measure its actual side and select Square post. Nominal names and finished sizes may differ; substituting a round diameter gives the wrong displaced volume.

Why not round each hole up separately?

Rounding each hole separately can overstate the order when leftover mix can be used in the next hole. The total rounds only once; plan batching and working time with the product instructions.

References & method

QUIKRETE concrete mix product data. See how we check calculations. Reference links provide context; no supplier endorses this site.